What are the operation procedures of injection molds?

What are the operation procedures of injection molds?

Injection mold operating procedures mainly include the following steps:

1. Preparation:

Check whether the mold is intact, if there is damage or abnormal should be repaired or replaced immediately.
Prepare the injection molding machine and mold according to the production plan.
Check the operation status of the injection molding machine, and carry out necessary debugging and operation.

2, installation mold:

Use the appropriate tools to install the mold on the injection molding machine and ensure that it is firm and reliable.
Make preliminary adjustments to the mold to ensure that the parameters are set correctly.
Perform pressure test on the mold to check for leaks or anomalies.

3, adjust the mold:

According to product requirements, the mold is carefully adjusted, including mold temperature, mold locking force, molding time, etc.
According to the actual production situation, the mold is repaired and optimized accordingly.

4. Production operation:

Start the injection molding machine and carry out trial production to check whether the product meets the requirements.
During the production process, pay close attention to the running status of the mold and product quality, and stop the machine immediately if there is an anomaly.
Clean and maintain the mold regularly to ensure production efficiency and product quality.

广东永超科技模具车间图片27

5. Troubleshooting:

If you encounter mold failure or product quality problems, you should immediately stop for inspection, and take appropriate measures for maintenance and treatment.
Faults are recorded in detail for future analysis and prevention.

6, maintenance maintenance:

According to the actual situation of the mold, regular maintenance and maintenance, such as cleaning, lubrication, fastening and so on.
Replace or repair the damaged mold parts to ensure the normal operation of the mold.
Check the mold regularly to ensure its safety and stability.

7. Finish work:

After the completion of the day’s production tasks, turn off the injection molding machine, and carry out the corresponding cleaning and maintenance work.
Quality check and statistics of the products produced on the day, and record and analyze the operation of the mold.

According to the actual production situation, make the next day production plan and mold maintenance plan.